Modern universal boiler concept Buderus Logano G234 WS
Low temperature heating boiler according to DIN EN 297 with continuously variable boiler water temperature control without base temperature (minimum boiler water temperature)
Four certified boiler sizes with a nominal heating output of 38-55 kW
The heating boiler is designed to operate on natural gas H and liquefied gas P / B/P
Boiler design with perfectly fitted sections made of high-quality cast iron
Tested and reliable heating boiler with cast iron heat exchanger and atmospheric gas burner
Combines with adjacent Logalux ST and Logalux SU water heater tanks from the Buderus program
Can be combined with various control systems from the Buderus program
High standardized utilization rate (93%) and low emissions of harmful substances
Quiet and reliable operation
Atmospheric gas burner with pre-mixing without fan
Heating mode without additional noise reduction measures
The minimum required pressure of network natural gas at the inlet is 10 mbar (for Logano G234 boilers with a power of 38, 44, 50, 55 kW).
Simple and convenient control
Control functions coordinated with the plant hydraulics
Easy setup of all control system functions (Push and Turn principle)
It is possible to expand the configuration of all control systems for additional modules
Quick installation, commissioning and maintenance of the Buderus Logano G234 WS boiler
A system for quickly installing the heating circuit, adapted to the corresponding hydraulic circuit, for connecting it to the boiler or mounting it to the wall
Convenient connection of Logalux ST and Logalux SU water heater tanks with a capacity of 150, 160, 200 and 300 liters to the boiler thanks to the boiler-water heater connecting pipeline with loading pump and check valve
Burner design without moving parts
Easy conversion of the burner to other types of gas
Floor-standing gas cast iron boiler Buderus Logano G234WS (AW.50.2-Kombi) 7738503643 - 50 kW without control system
TeploSpetsTsentr, LLC
Spartakovskaya Square, building 14, building 1, right entrance, office 306, 105082 Moscow
Itek, LLC
st. Storozhevaya, 4, building 3, 111020 Moscow
Termostudiya, LLC
Varshavskoe highway 25 A, building 6, 117105 Moscow
NIK engineering (branch Pelteh), LLC
10 Dokukina st., building 41, 129226 Moscow
Rainbow-service, LLC
st. Azovskaya, 15-A, 117452 Moscow
Pelteh, LLC
st. Kotlyakovskaya, 3, building 1, 115201 Moscow
Termosystem, OOO
Irkutskaya, 11/17 office center "Shchelkovsky", 107497 Moscow
Company PROTON+, LLC
st. Kolontsova, 15, 141009 Mytishchi
LEX plus, LLC
Festivalnaya st., 2, 142152 Fedyukovo
Company PROTON+, LLC
st. Sovetskaya, 90, 143430 Nakhabino, Krasnogorsky district
BazisTeploStroy, LLC
Rublevo-Uspenskoe highway, 28 km from MKAD, no. 50/1, 143032 Gorki 10
Teplosfera IC, LLC
Privokzalnaya str., 12, 601010 Kirzhach
The online store website delivers any product using its own delivery service.
Before you start using the product, check whether your idea of the product corresponds to its actual characteristics. It is extremely rare, but there are cases of errors in product descriptions on the site. All main characteristics are indicated in the operating instructions supplied with the product. You can refuse the product if, upon receipt of the product, you find a difference in its description on the website and instructions. Try to find out this issue before you start using the product, and we will promptly replace the product or return the money.
Please note that due to the multiple increase in fines for illegal parking, delivery of orders to office buildings in the absence of free parking spaces or access to the territory is not guaranteed. We reserve the right to ask to meet our driver before entering the building.
Order amount up to 5,000 ₽ | Order amount from 5,000 ₽ to 50,000 ₽ | Order amount from 50,000 ₽ | |
---|---|---|---|
Moscow | 730 ₽ | 390 ₽ | For free |
Saint Petersburg | 730 ₽ | 390 ₽ | For free |
beyond the Ring Road | 730 ₽ + 30 ₽/km from the Ring Road | 390 ₽ + 30 ₽/km from the Ring Road | 30 ₽/km from the Ring Road |
To the cities of the Moscow region | |||
Lyubertsy urban district | 770 RUR | 440 ₽ | 90 ₽ |
Mytishchi urban district | 770 RUR | 440 ₽ | 90 ₽ |
Reutov urban district | 770 RUR | 440 ₽ | 90 ₽ |
Khimki urban district | 770 RUR | 440 ₽ | 90 ₽ |
Krasnogorsk urban district | 880 ₽ | 540 ₽ | 190 ₽ |
Balashikha urban district | 880 ₽ | 540 ₽ | 190 ₽ |
Dolgoprudny urban district | 880 ₽ | 540 ₽ | 190 ₽ |
Leninsky district | 1030 ₽ | 690 ₽ | 340 ₽ |
Odintsovskii district | 1030 ₽ | 690 ₽ | 340 ₽ |
Dzerzhinsky urban district | 1030 ₽ | 690 ₽ | 340 ₽ |
Korolev urban district | 1070 ₽ | 740 ₽ | 390 ₽ |
Lytkarino urban district | 1070 ₽ | 740 ₽ | 390 ₽ |
Ivanteevka urban district | 1170 ₽ | 840 ₽ | 490 ₽ |
Lobnya urban district | 1170 ₽ | 840 ₽ | 490 ₽ |
Podolsk urban district | 1230 ₽ | 890 ₽ | 540 ₽ |
Domodedovo urban district | 1230 ₽ | 890 ₽ | 540 ₽ |
Pushkinsky district | 1280 ₽ | 940 ₽ | 590 ₽ |
Schelkovsky district | 1280 ₽ | 940 ₽ | 590 ₽ |
Urban district of ZATO Vlasikha | 1480 ₽ | 1140 ₽ | 790 RUR |
City district of ZATO Krasnoznamensk | 1480 ₽ | 1140 ₽ | 790 RUR |
Zhukovsky urban district | 1480 ₽ | 1140 ₽ | 790 RUR |
Krasnoarmeysk urban district | 1480 ₽ | 1140 ₽ | 790 RUR |
Fryazino urban district | 1670 ₽ | 1330 ₽ | 970 ₽ |
Losino-Petrovsky urban district | 1670 ₽ | 1330 ₽ | 970 ₽ |
Istra urban district | 1800 ₽ | 1470 ₽ | 1090 ₽ |
Ramensky district | 1800 ₽ | 1470 ₽ | 1090 ₽ |
Noginsky district | 1800 ₽ | 1470 ₽ | 1090 ₽ |
Chernogolovka urban district | 1970 RUR | 1640 ₽ | 1290 ₽ |
Bronnitsy urban district | 1970 RUR | 1640 ₽ | 1290 ₽ |
Elektrostal urban district | 1970 RUR | 1640 ₽ | 1290 ₽ |
Zvenigorod urban district | 1970 RUR | 1640 ₽ | 1290 ₽ |
Dmitrovsky district | 2230 ₽ | 1890 RUR | 1540 ₽ |
Solnechnogorsk district | 2230 ₽ | 1890 RUR | 1540 ₽ |
Chekhov urban district | 2230 ₽ | 1890 RUR | 1540 ₽ |
Naro-Fominsk urban district | 2530 ₽ | 2190 ₽ | 1840 ₽ |
Sergiev Posad district | 2530 ₽ | 2190 ₽ | 1840 ₽ |
Urban district of ZATO Voskhod | 2530 ₽ | 2190 ₽ | 1840 ₽ |
Pavlovsky Posad urban district | 2680 ₽ | 2340 ₽ | 1990 ₽ |
Elektrogorsk urban district | 2680 ₽ | 2340 ₽ | 1990 ₽ |
Delivery to the specified cities is carried out through a transport company. Below is the cost of delivery to the transport company terminal in Moscow | |||
Volokolamsk district | 730 ₽ | 390 ₽ | For free |
Voskresensky district | 730 ₽ | 390 ₽ | For free |
Yegoryevsk urban district | 730 ₽ | 390 ₽ | For free |
Zaraysk urban district | 730 ₽ | 390 ₽ | For free |
Kashira urban district | 730 ₽ | 390 ₽ | For free |
Klin urban district | 730 ₽ | 390 ₽ | For free |
Kolomna urban district | 730 ₽ | 390 ₽ | For free |
Lotoshinsky district | 730 ₽ | 390 ₽ | For free |
Lukhovitsy urban district | 730 ₽ | 390 ₽ | For free |
Mozhaisk district | 730 ₽ | 390 ₽ | For free |
Ozyory urban district | 730 ₽ | 390 ₽ | For free |
Ruza urban district | 730 ₽ | 390 ₽ | For free |
Stupino urban district | 730 ₽ | 390 ₽ | For free |
Serebryanye Prudy urban district | 730 ₽ | 390 ₽ | For free |
Taldomsky district | 730 ₽ | 390 ₽ | For free |
Shatura urban district | 730 ₽ | 390 ₽ | For free |
Shakhovskaya urban district | 730 ₽ | 390 ₽ | For free |
Zvezdny Gorodok ZATO urban district | 730 ₽ | 390 ₽ | For free |
City district ZATO Molodezhny | 730 ₽ | 390 ₽ | For free |
Orekhovo-Zuevo urban district | 730 ₽ | 390 ₽ | For free |
Dubna urban district | 730 ₽ | 390 ₽ | For free |
Serpukhov urban district | 730 ₽ | 390 ₽ | For free |
Pushchino urban district | 730 ₽ | 390 ₽ | For free |
Protvino urban district | 730 ₽ | 390 ₽ | For free |
Kotelniki urban district | 730 ₽ | 390 ₽ | For free |
Roshal urban district | 730 ₽ | 390 ₽ | For free |
Likino-Dulyovo urban district | 730 ₽ | 390 ₽ | For free |
To Russian cities to the transport company | |||
To the transport company terminal | 730 ₽ | 390 ₽ | For free |
Pickup - free |
Delivery terms:
The purchased goods are delivered to the entrance (cottage gate or private house gate). If reasons arise that prevent the vehicle from arriving, delivery is carried out to a place as close as possible to the place of planned unloading of the goods without violating traffic regulations. If the territory of the delivery destination provides for paid entry, then the Buyer must compensate the cost of entry of the vehicle.
Climbing to the floor
You can use the Goods Lifting service. This service is paid. Our company's employees will deliver your order directly to your apartment, regardless of whether your building has an elevator. Prices for lifting, check with the manager.
Can I use a third party shipping company for delivery?
Yes, this option is possible in agreement with your personal manager. In this case, you will only pay for delivery in Moscow, but our responsibility for the safety of the goods will be limited to the moment the order is transferred to the transport company you have chosen.
Transport companies:
ATTENTION! Within 7 (seven) days after receiving the goods, you have the right to refuse the purchase without giving reasons, if you have not used the goods and have fully preserved its packaging and presentation.
The transferred funds are returned to your bank account or in cash (Depending on the payment method) within 5-30 working days (the period depends on the Bank that issued your bank card).
If the client refuses to deliver the goods on time and of proper quality, the client will compensate for delivery costs.
All products sold on our online store website have certificates of conformity, warranty cards and instructions in Russian.
Above the specified limits, an additional fee of 30 rubles is charged. for 1 km.
The prices indicated on the website are final and do not require additional payments under standard delivery conditions. All taxes are included in the price of the product.
Possible payment methods
Cash: Payment in cash to the courier upon delivery in Moscow, Moscow Region, or upon pickup at the store’s office. |
|
Cashless payments: Payment for goods by bank transfer is possible for all legal entities and individuals. After receiving your order, you will be sent an invoice by email. The invoice is valid for payment within three banking days. After paying the invoice, we ask you to contact the manager and inform about payment of the invoice or send a payment order by email [email protected] so that we do not cancel the reservation at the warehouse and check the delivery date and time with the manager. |
|
By bank card to the courier or in our office: We accept the following types of cards for payment: Visa, Visa Electron, Mastercard, Mastercard Electronic, Maestro. If you want to pay for the goods by credit card, please indicate this in the comments to your order. You can pay by card when receiving the goods to the courier or at the delivery office, through a mobile terminal. | |
1. After the manager confirms the availability of the goods, transfer the required amount in rubles to our account4100 1837 5253 09
via Yandex.Money wallet. 2. If you don’t have a wallet, transfer money to our account through instant payment terminals or in banks in your city,servicing Yandex.Money payments. After payment send to [email protected] payment notice. |
Warranty
- The manufacturer's warranty period for the equipment (with the exception of some series indicated separately) is 24 months from the date of commissioning of the equipment, but not more than 27 months, respectively, from the date of purchase of the equipment by the end Consumer.
- The warranty period for components and assemblies replaced after the expiration of the warranty period, as well as for spare parts, is 12 months from the date of installation. The date of installation of the spare part must be recorded in the warranty card for the equipment.
- For the Manufacturer to provide a warranty, compliance with the following conditions is mandatory:
- Installation and commissioning of equipment must be carried out in compliance with current building codes and regulations (SNiP), state standards (GOST), local norms, as well as the instructions for installation and operation of the Equipment Manufacturer and the relevant regulatory and technical documentation of the Russian Federation;
- Installation, commissioning of equipment and commissioning work must be carried out by specialists authorized to perform such work, or by organizations authorized by the Manufacturer for installation and/or warranty service of the relevant type of equipment, the list of which is indicated on the websites bosch-climate.ru and/or www .buderus.ru;
- Availability of a certificate of commissioning and/or a note on installation/commissioning of equipment in the warranty card;
- After 12 (twelve) months from the start of operation of the equipment, within 2 months it is necessary to carry out scheduled maintenance of the equipment with the appropriate mark in the warranty card by a service organization authorized by the Seller and/or Manufacturer;
- Prior to installation, the equipment should be stored in a warm, dry place.
- Warranty claims will not be accepted in the following cases:
4.1. Structural changes have been made to the equipment without agreement with the Manufacturer/organization authorized by the Manufacturer to carry out such work.
4.2. Parts manufactured by others are installed on the equipment.
4.3. The rules for installation and operation of the Manufacturer’s equipment are not followed.
4.4. Repairs or tampering with the equipment were carried out by specialists who were not authorized to repair the relevant type of equipment;
4.5. The malfunction is a consequence of:
- connecting equipment to communications and systems (power supply, water supply network, etc.) that do not comply with GOST, SNiP requirements and instructions for installation and operation of equipment;
- use of energy and coolants that do not comply with GOST, SNiP requirements and instructions for installation and operation of equipment;
- penetration of foreign objects, substances, liquids, animals, insects, etc. into the product.
- receipt of mechanical damage during the delivery of equipment by the Consumer from the point of sale to the place of installation and operation, which caused the equipment to malfunction;
- improper operation of related equipment technologically related to the Manufacturer’s products, including short circuits, voltage drops (fluctuations) in the power supply network, various types of failures and interruptions (in violation of established standards and regulations) in the functioning of other engineering networks and communications on site installations;
- equipment malfunction due to air pollution due to excessive dust deposition, due to aggressive exposure to vapors, oxygen corrosion, chemical, electrochemical or electrical influences, installation of equipment in unsuitable premises, or continued use of the equipment after detection of a defect.
- acts of force majeure (fire, flooding, natural disasters, etc.), as well as intentional or careless actions and negligent handling of the Consumer or third parties.
- The warranty does not apply to:
- cases where wear parts such as burner nozzles, emission reduction burner tips, magnesium anodes, fuses, seals, combustion chamber lining or flame contact ignition and flame control devices (and other similar) fail due to normal wear and tear.
- cases when, due to any malfunction, the equipment was dismantled without the consent of the Manufacturer/organization authorized by the Manufacturer to carry out such work.
- The manufacturer has obligations under the Consumer Protection Act.
- When making a complaint about the quality of a product, the Consumer is obliged to provide access to the equipment to check its quality. At least once a year, equipment must undergo maintenance at service centers. In case of violation of this requirement, the Manufacturer has the right to refuse warranty repairs and replacement of equipment. The period for troubleshooting should not exceed 45 (forty-five) days.
For your safety:
Installation, commissioning, repair and maintenance must be carried out only by specialists authorized to perform such types of work.
For reliable and safe operation of the equipment, it is recommended to install filters on the gas and water supply (hot water supply), a dielectric separating insert on the gas connection line, mandatory installation of a filter on the return pipeline of the heating system, and it is also recommended to use an uninterruptible power supply or voltage stabilizer, the use of systems water treatment in the heating system. Ensure that the equipment is suitable for the system to which it is connected or to which it is to be installed. The parameters of the fuel and electrical network coincide with those specified in the operating instructions.
The Manufacturer's warranty obligations have been explained to me and are understandable.and I fully approve.
Buderus Logano G234 WS-50 kW Floor-standing gas boiler, cast iron, atmospheric burner
Logano G234 WS
- Boiler block design with perfectly matched sections
- Boiler sections made of high quality cast iron GL 180 M
- Combustion chamber closed on all sides
- Intensive heat transfer of heating surfaces thanks to special fins
- Easy installation and maintenance thanks to simple design
- Fully automatic operation with electric ignition, no additional gas consumption required for ignition
- To make it easy to connect gas to the boiler at the back, there is a gas pipeline under its casing.
- Thermal insulation 80 mm thick. reduces heat loss to a minimum
- The heating boiler is completely assembled together with the casing - this saves time and installation costs
- Compact dimensions - an advantage when carried through openings and when placed in a boiler room
- Various combinations with control systems and cylinders - to suit every need
- Large selection of additional equipment for quick installation, adapted to a specific boiler
- Fully automatic burner with electric ignition
- Ionization flame control and double magnetic valve
- The Venturi tube of a gas burner ensures mixing of fuel with air. During the combustion process, many small individual flames are formed without a high-temperature core. Therefore, in such gas burners the combustion temperature is significantly reduced. In addition, the short flame of these fireplaces easily breaks away from the burner rod, reducing the heat load on it
- Heating boiler - for operation on natural gas H, with thermal insulation and boiler casing - 1 box
- Conversion kit for liquefied gas P and B/P (additional equipment) - 1 box
- Control system (optional) - 1 box
Flue gas temperature / chimney connection
The required pressure is for all boiler sizes a minimum of 3 and a maximum of 10 Pa.
For more precise adjustment and maintenance of draft in the chimney, as well as for organizing ventilation of the chimney itself, it is recommended to install and adjust an additional air regulator (draft limiter). The cross-section of the additional air regulator depends on the effective height and cross-section of the chimney.
Flue gas shut-off valve
If desired, a flue gas shut-off valve can be purchased as an optional extra. A flue gas shut-off valve installed before the draft breaker is more effective than one installed after it.
Installations with underfloor heating
In floor heating systems using oxygen-permeable plastic pipes (DIN 4726), it is necessary to install a heat exchanger between the heating boiler and the floor heating system.
Preparing hot water
The heating boiler can work with any water heater tank. Combinations of the boiler with tanks from the Logalux ST/SU series have particular advantages.
General provisions
- For heating boilers that must be equipped with a flue gas monitoring system according to the FeuVO of the relevant federal state, accessories can be supplied
- For version B11 (without flue gas monitoring system), the boiler may only be installed in rooms that have the required ventilation to the atmosphere and also have a self-closing and sealed door, for example in boiler rooms
- For version B11 BS (with flue gas monitoring system), the heating boiler can be installed in apartments or similar places
- To ensure the functioning of the boiler, all connections must be made in the places specified for them.
- When installing a gas heating boiler operating on liquefied gas below ground level, it is recommended to install a second solenoid valve. A switchgear for controlling the solenoid valve can be supplied as an option
- In installations with underfloor heating, with several heating circuits, as well as in installations with large water volumes, it is necessary to install a mixer to regulate the heating circuits, based on local operating conditions.
To ensure environmentally friendly and trouble-free operation, we recommend regular inspections of the boiler and burner.
When installing the heating boiler, the minimum distances shown (indicated in parentheses) must be observed. For ease of installation, servicing and maintenance, it is necessary to maintain the recommended distances from the walls.
The room for installing equipment must be protected from the cold and have good ventilation. In addition, care must be taken to ensure that the combustion air is not contaminated with dust or halogenated hydrocarbons. Halogenated hydrocarbons of all types are found, for example, in aerosol cans, solvents and cleaners, varnishes, paints and adhesives.
Modern universal boiler concept
- Low temperature heating boiler according to DIN EN 297 with continuously variable boiler water temperature control without base temperature (minimum boiler water temperature)
- Four certified boiler sizes with a nominal heating output of 38-55 kW
- The heating boiler is designed to operate on natural gas H and liquefied gas P / B/P
- Boiler design with perfectly fitted sections made of high-quality cast iron
- Tested and reliable heating boiler with cast iron heat exchanger and atmospheric gas burner
- Combines with adjacent Logalux ST and Logalux SU water heater tanks from the Buderus program
- Can be combined with various control systems from the Buderus program
- High standardized utilization rate (93%) and low emissions of harmful substances
- Atmospheric gas burner with pre-mixing without fan
- Heating mode without additional noise reduction measures
- Stable operation on natural gas with supply pressure up to 10 mbar
- Control functions coordinated with the plant hydraulics
- Easy setup of all control system functions (Push and Turn principle)
- It is possible to expand the configuration of all control systems for additional modules
- A system for quickly installing the heating circuit, adapted to the corresponding hydraulic circuit, for connecting it to the boiler or mounting it to the wall
- Convenient connection of Logalux ST and Logalux SU water heater tanks with a capacity of 150, 160, 200 and 300 liters to the boiler thanks to the boiler-water heater connecting pipeline with loading pump and check valve
- Burner design without moving parts
- Easy conversion of the burner to other types of gas
Floor-standing gas cast iron heating boilers Buderus Logano G234WS with an atmospheric burner with a power of 38, 44, 50, 55 kW.
A new generation of time-tested boilers with modern EMS Plus automation and industrial design from Buderus.
Modern universal boiler concept Buderus Logano G234 WS
- Low-temperature heating boiler according to DIN EN 297 for continuously regulating the boiler water temperature without a base temperature (minimum boiler water temperature)
- Four certified boiler sizes with rated heating output from 38 to 55 kW
- The heating boiler is designed to operate on natural gas H or liquefied gas P /B/P
- Boiler design with perfectly fitted sections made of high-quality cast iron
- Tested and reliable heating boiler with cast iron heat exchanger and atmospheric gas burner
- Combines with adjacent Logalux SU water heater tanks from the Buderus program
- Can be combined with various EMS and EMS Plus control systems from the Buderus program
- New "industrial" design from Buderus
- High standardized utilization rate (92%) and low emissions of harmful substances
Quiet and reliable operation
- Atmospheric gas burner with pre-mixing without fan
- Heating mode without additional noise reduction measures
- Stable operation on natural gas with supply pressure up to 10 mbar
Simple and convenient control with modern weather-compensated automation Logamatic MC110 standard EMS Plus
- System controller RC310 or BC30E with touch display and full text menu
- Readable text, symbols, status and error information
- Control functions coordinated with the plant hydraulics
- Simple step-by-step and intuitive setup of all control system functions
- It is possible to expand the configuration of the control system with additional modules:
- KM200 module for remote control via the Internet
- Mixing module MM100
- Cascade module MC400 with the ability to control up to 4 boilers
- For complex systems, we recommend using the new generation of professional automation Logamatic 5000
Quick installation, commissioning and maintenance of the Buderus Logano G234WS boiler
- A system for quickly installing the heating circuit, adapted to the corresponding hydraulic circuit, for connecting it to the boiler or mounting it to the wall
- Convenient connection of Logalux SU water heater tanks with a capacity of 120, 160, 200 and 300 liters to the boiler thanks to the boiler-water heater connecting pipeline with loading pump and check valve
- Burner design without moving parts
- Easy conversion of the burner to other types of gas
Article: 8732204653
Documentation
Installation and maintenance instructions Logano G234 WS | 2.08 MB | |
Operating instructions Logano G234 WS | 460 KB | |
Technical data sheet Logano G234 WS | 324 KB | |
Installation instructions for a gas pressure monitoring device | 180 KB | |
Certificate of conformity | 1.29 MB |
Logano G234 WS
- Boiler block design with perfectly matched sections
- Boiler sections made of high quality cast iron GL 180 M
- Combustion chamber closed on all sides
- Intensive heat transfer of heating surfaces thanks to special fins
- Easy installation and maintenance thanks to simple design
- Fully automatic operation with electric ignition, no additional gas consumption required for ignition
- To make it easy to connect gas to the boiler at the back, there is a gas pipeline under its casing.
- Thermal insulation 80 mm thick. reduces heat loss to a minimum
- The heating boiler is completely assembled together with the casing - this saves time and installation costs
- Compact dimensions - an advantage when carried through openings and when placed in a boiler room
- Various combinations with control systems and cylinders - to suit every need
- Large selection of additional equipment for quick installation, adapted to a specific boiler
- Fully automatic burner with electric ignition
- Ionization flame control and double magnetic valve
- The Venturi tube of a gas burner ensures mixing of fuel with air. During the combustion process, many small individual flames are formed without a high-temperature core. Therefore, in such gas burners the combustion temperature is significantly reduced. In addition, the short flame of these fireplaces easily breaks away from the burner rod, reducing the heat load on it
- Heating boiler - for operation on natural gas H, with thermal insulation and boiler casing - 1 box
- Conversion kit for liquefied gas P and B/P (additional equipment) - 1 box
- Control system (optional) - 1 box
Hydraulic resistance of the boiler through water
Fuel
The gas burners are factory set for natural gas H, comparable to the EE-H method. You can change the gas type to liquefied P/B/P at any time using the conversion parts. Conversion to city gas is not possible. The supplied gas pressure (supplied pressure is the static excess pressure of the gas relative to atmospheric pressure when it flows out at the connection point of the gas appliance) must be in the following range:
1) - Up to 8 mbar when working with a gas pressure monitoring device
The maximum supply pressure when operating on natural gas can be 25 mbar. If the supplied gas pressure is higher, it is necessary to install an additional gas pressure regulator on the burner. The maximum test pressure is 150 mbar.
Flue gas temperature / chimney connection
The required pressure is for all boiler sizes a minimum of 3 and a maximum of 10 Pa.
For more precise adjustment and maintenance of draft in the chimney, as well as for organizing ventilation of the chimney itself, it is recommended to install and adjust an additional air regulator (draft limiter). The cross-section of the additional air regulator depends on the effective height and cross-section of the chimney.
Flue gas shut-off valve
If desired, a flue gas shut-off valve can be purchased as an optional extra. A flue gas shut-off valve installed before the draft breaker is more effective than one installed after it.
Installations with underfloor heating
In floor heating systems using oxygen-permeable plastic pipes (DIN 4726), it is necessary to install a heat exchanger between the heating boiler and the floor heating system.
Preparing hot water
The heating boiler can work with any water heater tank. Combinations of the boiler with tanks from the Logalux ST/SU series have particular advantages.
General provisions
- For heating boilers that must be equipped with a flue gas monitoring system according to the FeuVO of the relevant federal state, accessories can be supplied
- For version B11 (without flue gas monitoring system), the boiler may only be installed in rooms that have the required ventilation to the atmosphere and also have a self-closing and sealed door, for example in boiler rooms
- For version B11 BS (with flue gas monitoring system), the heating boiler can be installed in apartments or similar places
- To ensure the functioning of the boiler, all connections must be made in the places specified for them.
- When installing a gas heating boiler operating on liquefied gas below ground level, it is recommended to install a second solenoid valve. A switchgear for controlling the solenoid valve can be supplied as an option
- In installations with underfloor heating, with several heating circuits, as well as in installations with large water volumes, it is necessary to install a mixer to regulate the heating circuits, depending on local operating conditions.
To ensure environmentally friendly and trouble-free operation, we recommend regular inspections of the boiler and burner.
Boiler installation room
When installing the heating boiler, the minimum distances shown (indicated in parentheses) must be observed. For ease of installation, servicing and maintenance, it is necessary to maintain the recommended distances from the walls.
The room for installing equipment must be protected from the cold and have good ventilation. In addition, care must be taken to ensure that the combustion air is not contaminated with dust or halogenated hydrocarbons. Halogenated hydrocarbons of all types are found, for example, in aerosol cans, solvents and cleaners, varnishes, paints and adhesives.
Modern universal boiler concept
- Low temperature heating boiler according to DIN EN 297 with continuously variable boiler water temperature control without base temperature (minimum boiler water temperature)
- Four certified boiler sizes with a nominal heating output of 38-55 kW
- The heating boiler is designed to operate on natural gas H and liquefied gas P / B/P
- Boiler design with perfectly fitted sections made of high-quality cast iron
- Tested and reliable heating boiler with cast iron heat exchanger and atmospheric gas burner
- Combines with adjacent Logalux ST and Logalux SU water heater tanks from the Buderus program
- Can be combined with various control systems from the Buderus program
- High standardized utilization rate (93%) and low emissions of harmful substances
- Atmospheric gas burner with pre-mixing without fan
- Heating mode without additional noise reduction measures
- Stable operation on natural gas with supply pressure up to 10 mbar
- Control functions coordinated with the plant hydraulics
- Easy setup of all control system functions (Push and Turn principle)
- It is possible to expand the configuration of all control systems for additional modules
- A system for quickly installing the heating circuit, adapted to the corresponding hydraulic circuit, for connecting it to the boiler or mounting it to the wall
- Convenient connection of Logalux ST and Logalux SU water heater tanks with a capacity of 150, 160, 200 and 300 liters to the boiler thanks to the boiler-water heater connecting pipeline with loading pump and check valve
- Burner design without moving parts
- Easy conversion of the burner to other types of gas